October 2026, ESG
Behind the artificial intelligence boom is a major physical infrastructure buildout.
Data centers need reliable power and cooling. And projects can face scrutiny over their impact on local communities.
For fixed income investors, data center deals can look very different depending on how they’re powered, cooled, and operated, who uses the capacity, and the quality of the project-level disclosure.
The scale is growing. Global data center electricity use could almost double between 2025 and 2030. Electricity use from AI-focused data centers alone is projected to triple. At T. Rowe Price, we have developed a framework to assess data center financings across four areas to better understand project opportunities and externalities. First, tenant and use case: who is using the capacity, and for what purpose? Second, electricity and grid: how is the facility powered, and what does it mean for the local grid?
Third, water and cooling: how does the cooling design affect water use, particularly in water-stressed locations? And fourth, efficiency: does the asset have best in class design to maximize efficiency?
No single metric tells the whole story.
A data center may perform well on water efficiency while relying on a carbon-intensive grid. Or it may report strong energy metrics while providing limited information on tenant use or operating performance.
Grid and water constraints, permitting delays, and local opposition can increase costs, delay construction, or limit future expansion — with potential implications for project economics and cash flows. As data center financing grows, the aim is to bring greater underwriting discipline to this fast-growing market. Ultimately, the analysis comes back to the asset itself: what it contributes, what risks it creates, and how confidently those characteristics can be assessed.
Read our full paper, Beyond the AI boom: A framework for evaluating data center bonds.
202610-6040600
As global economies become more digital and computationally intensive, data centers have become critical infrastructure that is tied not only to economic growth, but also to national security. While data center expansion enables productivity and innovation (and in turn economic growth), their physical infrastructure requirement has a significant environmental and social footprint. Data center developments can put pressure on power grids, water resources, and other local infrastructure as well as generate noise and disruption from construction and operations.
Notably, the AI and data center build‑out carries very different dynamics from other large infrastructure investments because of (1) the speed of development and (2) the geographic disconnection between their costs and benefits.
Technology companies are developing new computing capacity on timelines much shorter than those required to build the electricity generation, transmission networks, substations, water infrastructure, and other systems needed to support that capacity. In advanced economies, data center development can occur in one to two years, whereas its supporting infrastructure can require timelines of three to 10 years. Further compounding the speed of development are the competitive and national security dynamics of adding compute capacity and the extraordinarily well‑capitalized nature of technology companies.
The benefits of digital infrastructure are distributed across the global economy, whereas the costs are concentrated in the communities in which they are located. Other assets such as mines, oil and gas facilities, ports, and factories also serve distant markets, but they employ many local workers. Data centers are different in that they are highly automated, so they employ few people once built. Their revenue is also harder to tax.
...T. Rowe Price has developed a proprietary framework for evaluating data center deals that complements traditional credit analysis by highlighting factors that can affect cash flows and project execution.
To help investors navigate these dynamics, T. Rowe Price has developed a proprietary framework for evaluating data center deals that complements traditional credit analysis by highlighting factors that can affect cash flows and project execution.
The scale of the data center infrastructure challenge is growing. According to the International Energy Agency (IEA), data center electricity demand was 485 terawatt‑hours (TWh) or 1.5% of global electricity demand in 2025. The IEA forecasts that the sector’s electricity demand will double by 2030 to roughly 950 TWh. The key driver of this growth is from AI‑focused data centers, which are projected to triple over the same period.1
On the surface, reaching 3% of global electricity demand by 2030 may not sound that extreme, but this needs to be viewed in context: this is additional growth on top of the shift toward electrification. Additionally, data center demand growth is expected to be geographically concentrated. A significant proportion of data center growth will come in the United States and China, and, within a given region, data centers are primarily concentrated in hubs, where they can benefit from grid infrastructure, electricity supply, and skilled labor, for example.1 In light of these factors, the reality is that new data center growth is having an outsized impact on localized electricity markets, which, in many cases, is contributing to rising electricity bills and water constraints for the local community.
Many local governments have not been ready for the speed, scale, and concentration of the current data center build‑out. Historically, local planning frameworks have only focused on conventional commercial or industrial developments, as opposed to facilities like data centers that draw heavily on local electricity, water, and other infrastructure and do not provide notable long‑term employment opportunities.
Not surprisingly, the AI and data center build‑out has become controversial, particularly in the United States, where local moratoriums appear to function as preemptive planning tools to give communities time to study land use, electricity, water, noise, and fiscal impacts. For bondholders it shows up as permitting delays, litigation, additional mitigation requirements, and limits on future expansion. Any of these issues can delay construction, raise costs, or defer the cash flows that service the debt.
The local opposition to development is often referred to as “NIMBYism” (short for “not in my backyard”). Whoever pays for new power infrastructure is often the most contentious issue. Where generation, transmission upgrades, or other supporting infrastructure is charged to residential and small business ratepayers, a project is more exposed to local opposition and regulatory intervention. Rules on siting, resource use, and disclosure are also still developing, so the requirements a project faces can change between financing and completion.
The AI and data center build‑out is creating a wide spectrum of investment opportunities in fixed income as the financing is needed for data centers, power generation, cooling equipment, transmission, semiconductor manufacturing, fiber connectivity, and other supporting infrastructure. The scale and speed of the build‑out mean that financing needs range across the credit spectrum, including highly rated technology companies, leveraged data center developers, and individual power projects.
Fixed income investors occupy an important position as debt financing can support the physical build-out of AI and data centers...
Fixed income investors occupy an important position as debt financing can support the physical build‑out of AI and data centers, which can mean financing tangible infrastructure such as the data centers themselves as well as associated power and grid infrastructure. Given the importance that environmental and social perspectives can have on a data center’s viability, T. Rowe Price has developed a framework for evaluating data center deals at the asset level, which assesses four key dimensions: tenant and use case, electricity and grid usage, water impacts, and efficiency.
Our framework is a useful tool to identify key environmental or social risks with a specific issuer and help inform its potential inclusion within a portfolio, as appropriate to the mandate. The framework is designed to complement traditional credit analysis, as we believe few sectors’ sustainability and credit risks are linked as closely as AI and data center infrastructure. Grid and water availability can surface infrastructure and permitting constraints, while local opposition can lead to permitting delays and litigation. Where these issues raise costs or delay construction, they can affect project economics, cash flows, and bondholder outcomes. Additionally, the framework can help us identify data center investments that can deliver a positive environmental and/or social impact.
In our experience, data centers rarely present a uniformly strong or weak profile. Our framework is designed to highlight those differences by assessing each asset across four dimensions and examining the quality of the underlying evidence. The objective is not to classify every data center as simply “good” or “bad.” It is to provide a structured way to compare deals and identify negative environmental and/or social externalities that remain unresolved.2 The framework is also useful for assessing where a project may make a positive contribution and potentially qualify for inclusion in our impact or labeled bond strategies.3
We have built our project‑level framework around the four pillars outlined in Figure 1. For fixed income investors, we believe the framework provides a consistent basis for assessing bonds, securitizations, or project‑finance structures.
(Fig. 1) We evaluate each pillar separately, then assess the quality of the evidence before making an investment judgment.
For illustrative purposes only. PUE = power usage effectiveness. WUE = water usage effectiveness. CUE = carbon usage effectiveness.
1 Additionality refers to the potential for a positive outcome that would not otherwise have occurred, or would have occurred to a lesser extent, without the project or investment.
The analysis from the framework can be used to help assess risks and opportunities in addition to traditional credit analysis by the broader fixed income team. The framework is also useful for assessing where a positive contribution may be made and potentially qualify for inclusion in our impact or labeled bond strategies.
See end of paper for definitions of terms used in this figure and others in the paper.
202610-6040600
Tenant and use case
The tenant and use case pillar evaluates who is using the data center capacity and whether that use is aligned with an impact mandate. A tenant supporting enterprise productivity, health care, education, cybersecurity, scientific research, public‑sector digital infrastructure, financial inclusion, or climate solutions would generally achieve the highest score. General‑purpose cloud and AI infrastructure require more judgment. Our view is that producing more intelligence using less energy is core to an energy efficiency impact thesis, so the assessment is whether the capacity can deliver on it. By contrast, use cases such as social media optimization would score poorly.
Beyond the use case itself, we look at the tenant, including whether workloads are broad and diversified; whether it has credible sustainability commitments and, for AI developers, published governance and safety policies; and whether those commitments apply to the financed asset and not only at the corporate level.
Electricity and grid
The electricity and grid pillar evaluates how the facility is powered and whether the project contributes to or mitigates grid stress. Because data centers are large‑load customers, the impact case depends on the source of power, the carbon intensity of the local grid, and the presence of project‑specific renewable or carbon‑free procurement. We also ask whether the project requires new fossil generation or transmission upgrades. Stronger scores require credible clean‑power procurement, preferably project‑level and local, with evidence of additionality through power purchase agreements, storage, demand response, green tariffs4, or dedicated grid investments.
Some of this is within an issuer’s control, and some is not. Procurement, additionality, and disclosure are choices the issuer makes, while the regional grid mix and interconnection constraints largely are not. Where grid information is missing, we reference the local grid mix, so regions with higher renewables penetration will naturally score better.
Who pays also matters because it is a common trigger for community pushback. A project that passes the cost of new supporting infrastructure on to residential and small business ratepayers scores lower in our framework.
Water and cooling
The water and cooling pillar evaluates whether the project’s cooling design creates local water risk. This is a critical part of data center diligence, since cooling choices can create water externalities that energy metrics do not capture. The framework rewards closed‑loop, dry‑cooling, air‑cooled, pumped‑refrigerant, liquid‑cooling, and other low‑consumptive‑water designs, particularly where water use is disclosed at the project level. It penalizes evaporative cooling or material water consumption in water‑stressed regions, especially where the water source, permitting status, expected daily use, or community concerns are not disclosed.
As with power, part of this is within the issuer’s control. Cooling technology and water disclosure are the issuer’s choices, and low‑consumptive designs can materially reduce water use. Local water stress is not, so the same design carries different risk in different places, and location counts in the score alongside technology. Water stress is also a leading source of community pushback. Where a facility competes with residents, farms, and other users for scarce supply, opposition is more likely, and permitting is harder, so a project in a water‑stressed area with material local opposition scores lower.
Efficiency
The efficiency pillar evaluates overall resource intensity, using power usage effectiveness (PUE), water usage effectiveness (WUE), and, where relevant, carbon usage effectiveness (CUE). The framework will take a more positive view of the actual operating performance over design estimates and project‑level reporting over portfolio‑level claims. Because many investment grade deals are still under construction, we plan to engage and reanalyze them once the data centers are operating. Strong scores require evidence that the financed asset is efficient in practice, not just marketed as green.
Relevant considerations include actual or expected PUE and WUE, cooling architecture, efficient power systems, graphics processing unit efficiency, server utilization, workload optimization, building certifications, and third‑party verification. We would also like to see issuers disclose CUE, but it is rarely reported today. Of the four pillars, this is the one an issuer can most directly demonstrate, through measured operating data and independent verification. Where only design‑stage figures or portfolio‑level claims are available, the score is weaker.
As labeled and non-labeled data center deals take a growing share of issuance, investors are being asked to decide whether any of them can credibly sit in an impact portfolio.5
The case for impact is real but conditional. Data centers are increasingly central to cloud computing, enterprise productivity, artificial intelligence, cybersecurity, scientific research, and other digitally enabled activities. Where a facility serves these uses and produces more computing with less energy, a financing may contribute to genuine efficiency gains. In our view, producing more intelligence using less energy is core to an energy efficiency impact thesis, and the “best-in-class” data centers identified through our framework align through increasing energy efficiency.
The comparison below is based on T. Rowe Price Responsible Investing and Impact Fixed Income team analysis of actual data center financings and reflects information available at the time of review. The purpose is to show why each pillar needs to be considered individually and alongside the others.
(Fig. 2)
| Investor Question | Profile A | Profile B | Profile C |
|---|---|---|---|
| Who uses the capacity? | Tenant not disclosed in the financing materials reviewed. | Tenant is a leading AI developer with published AI safety policies. | Tenant is a leading AI developer with published AI safety policies. |
| How is it powered? | Supported by renewable electricity procurement. | Grid-supplied power across five sites. One site has carbon-free procurement, and the others rely in part on natural gas. | Grid mix is heavily fossil-led, especially natural gas, with limited renewables. |
| How is water managed? | Closed-loop cooling, very low reported water use, and water-replenishment measures. | Liquid cooling design but no site-level heat rejection disclosed. | Deal did not disclose cooling architecture, water source and/or daily or annual water use. |
| What do we know about efficiency? | Provides project-level efficiency targets and some operating data. | Industry-leading chips to be used. Buildings are under construction, so operating efficiency data are not yet available. This is a point of engagement. | No target or actual operating-efficiency reporting was disclosed. |
| Investment Decision | Issuer A scores strongly in the framework. The issuer can deliver impact through improved energy efficiency and greenhouse gas reduction as measured by MWh saved and tCO2e saved. | Issuer B scores well in the framework, but issues are identified that would warrant engagement. The issuer has a high-quality tenant, but relies partly on natural gas, has not disclosed site-level heat rejection, and has no operating efficiency data yet. | Issuer C scores poorly in the framework and is not considered eligible as an impact investment. The issuer has a high-quality tenant but sits on a fossil-heavy grid and has disclosed no water or efficiency information. As such, it is not considered for impact investment. |
For illustrative purposes only. Not representative of an actual investment.
Source: T. Rowe Price analysis. For illustrative purposes only. Profiles are anonymized and simplified from the underlying research framework.
MWh = megawatt‑hours; tCO2e = metric tons of carbon dioxide equivalent.
For fixed income investors, the aim is to bring greater underwriting discipline to a fast‑growing part of the market. Data center developments can create significant environmental and social externalities, but they also can support important economic and sustainable outcomes. The investment judgment therefore depends on understanding both sides, namely where a deal may create incremental positive contribution and where risks remain. It also requires assessing how those risks could transmit into project economics and bondholder outcomes, and whether the available project‑level information is sufficient to support the investment case. Ultimately, the analysis comes back to the asset itself, from what it contributes, to what risks it creates and how confidently those characteristics can be assessed. As the data center market grows, I believe asset‑level analysis of this nature will be critical to identifying opportunities while managing risks for bondholders.
For fixed income investors, the aim is to bring greater underwriting discipline to a fast-growing part of the market.
1 International Energy Agency (IEA), Key Questions on Energy and AI, April 16, 2026. The IEA estimates global data center electricity consumption at 485 TWh in 2025 and around 950 TWh in 2030 in its central projection.
2 A negative externality refers to a negative sustainability or impact outcome arising from the production or consumption of a good or service, while a positive externality refers to a positive sustainability or impact outcome.
3 Impact investing strategies seek to generate positive, measurable environmental or social outcomes alongside financial returns. Labeled bond strategies invest in bonds designated for specific environmental or social purposes, such as green, social or sustainability bonds.
4 Green tariffs are utility pricing arrangements that allow customers to buy renewable electricity through their electricity provider.
5 Source: J.P. Morgan, as of September 30, 2026. AI-related companies are approximately 14.5% of the J.P. Morgan U.S. Investment Grade Corporate Bond Index, up 3 percentage points from 2020. J.P. Morgan estimates the share could rise to >20% by 2030 under current capital expenditure assumptions. Please see Additional Disclosures for more information.
Risks:
An impact strategy may not succeed in generating a positive environmental and/or social impact. The incorporation of environmental and/or social impact criteria into its investment process may cause it to perform differently from a strategy that uses a different methodology to identify and/or incorporate environmental and/or social impact criteria or relies solely or primarily on financial metrics.
Fixed-income securities are subject to credit risk, liquidity risk, call risk, and interest-rate risk. As interest rates rise, bond prices generally fall.
International investments can be riskier than U.S. investments due to the adverse effects of currency exchange rates, differences in market structure and liquidity, as well as specific country, regional, and economic developments.
Additional Disclosures
Information has been obtained from sources believed to be reliable but J.P. Morgan does not warrant its completeness or accuracy. The index is used with permission. The Index may not be copied, used, or distributed without J.P. Morgan’s prior written approval. Copyright © 2026, J.P. Morgan Chase & Co. All rights reserved.
Grid carbon intensity refers to the amount of carbon dioxide (CO2) emitted per unit of electricity generated by a power grid, typically measured in grams of CO2 per kilowatt-hour.
Water intensity refers to the amount of water used per unit of output or activity, such as the volume of water consumed relative to the computing capacity or energy use of a data center.
Credible clean-power procurement refers to sourcing electricity from lower-carbon or renewable energy sources, supported by clear evidence of its origin and associated environmental claims.
Green tariffs are utility pricing arrangements that allow customers to buy renewable electricity through their electricity provider.
Renewables penetration refers to the proportion of electricity generated from renewable energy sources, such as wind and solar, within a particular electricity grid or region.
For U.S. investors, visit troweprice.com/glossary for definitions of financial terms.
Please see vendor indices for more information, including definitions and source data: troweprice.com/marketdata.
Important Information
Outside of the United States, this is intended for investment professional use only. Not for further distribution.
This material is being furnished for informational and/or marketing purposes only and does not constitute an offer, recommendation, advice, or solicitation to sell or buy any security.
Prospective investors should seek independent legal, financial and tax advice before making any investment decision. T. Rowe Price group of companies including T. Rowe Price Associates, Inc. and/or its affiliates receive revenue from T. Rowe Price investment products and services.
Past performance is not a guarantee or a reliable indicator of future results. All investments involve risk, including possible loss of principal.
Information presented has been obtained from sources believed to be reliable, however, we cannot guarantee the accuracy or completeness. The views contained herein are those of the author(s), are as of September, 2026 are subject to change, and may differ from the views of other T. Rowe Price Group companies and/or associates. Under no circumstances should the material, in whole or in part, be copied or redistributed without consent from T. Rowe Price.
All charts and tables are shown for illustrative purposes only. Actual future outcomes may differ materially from any estimates or forward‑looking statements provided.
The material is not intended for use by persons in jurisdictions which prohibit or restrict the distribution of the material and in certain countries the material is provided upon specific request.
Australia—Issued by T. Rowe Price Australia Limited (ABN: 13 620 668 895 and AFSL: 503741), Level 28, Governor Phillip Tower, 1 Farrer Place, Sydney NSW 2000, Australia. For Wholesale Clients only.
Canada—Issued in Canada by T. Rowe Price (Canada), Inc. T. Rowe Price (Canada), Inc.’s investment management services are only available to non‑individual Accredited Investors and non‑individual Permitted Clients as defined under National Instrument 45‑106 and National Instrument 31‑103, respectively. T. Rowe Price (Canada), Inc. enters into written delegation agreements with affiliates to provide investment management services.
DIFC—Issued in the Dubai International Financial Centre by T. Rowe Price International Ltd which is regulated by the Dubai Financial Services Authority as a Representative Office. For Professional Clients only.
EEA—This material is issued and approved by T. Rowe Price (Luxembourg) Management S.à r.l. 35 Boulevard du Prince Henri L‑1724 Luxembourg which is authorised and regulated by the Luxembourg Commission de Surveillance du Secteur Financier. For Professional Clients only.
New Zealand—Issued by T. Rowe Price Australia Limited (ABN: 13 620 668 895 and AFSL: 503741), Level 28, Governor Phillip Tower, 1 Farrer Place, Sydney NSW 2000, Australia. No Interests are offered to the public. Accordingly, the Interests may not, directly or indirectly, be offered, sold or delivered in New Zealand, nor may any offering document or advertisement in relation to any offer of the Interests be distributed in New Zealand, other than in circumstances where there is no contravention of the Financial Markets Conduct Act 2013.
Switzerland—Issued in Switzerland by T. Rowe Price (Switzerland) GmbH, Talstrasse 65, 6th Floor, 8001 Zurich, Switzerland. For Qualified Investors only.
UK—This material is issued and approved by T. Rowe Price International Ltd, Warwick Court, 5 Paternoster Square, London EC4M 7DX which is authorised and regulated by the UK Financial Conduct Authority. For Professional Clients only.
USA—Issued in the USA by T. Rowe Price Associates, Inc., investment adviser, 1307 Point Street, Baltimore, MD 21231, which is regulated by the U.S. Securities and Exchange Commission. Intended for institutional investors only.
Unless otherwise indicated, this material is issued and approved by T. Rowe Price International Ltd, Warwick Court, 5 Paternoster Square, London EC4M 7DX which is authorised and regulated by the UK Financial Conduct Authority. For Professional Clients only.
© 2026 T. Rowe Price. All Rights Reserved. T. Rowe Price, INVEST WITH CONFIDENCE, the Bighorn Sheep design, and related indicators (see troweprice.com/ip) are trademarks of T. Rowe Price Group, Inc. All other trademarks are the property of their respective owners. Use does not imply endorsement, sponsorship, or affiliation of T. Rowe Price with any of the trademark owners.